# OEE Calculator (Overall Equipment Effectiveness) | Octura

Free Tool · Updated June 30, 2026

# OEE Calculator

Calculate the Overall Equipment Effectiveness (OEE) of a production asset from a single shift. OEE = Availability x Performance x Quality. Free, no email, and every result is shareable by link.

Calculator · Overall Equipment Effectiveness

## Calculate OEE for a production asset

OEE = Availability x Performance x Quality. Enter one shift of figures; world-class OEE is about 85%.

Planned production time (min) Shift length minus planned breaks

−+

Downtime (min) Breakdowns and unplanned stops during the shift

−+

Ideal cycle time (sec/unit) The fastest time to produce one unit

Total units produced All units, good and rejected

−+

Good units Units that pass first time, no rework

−+

OEE80.7%World-class OEE: about 85%

Run time433 min

Availability90.2%

Performance92.4%

Quality96.9%

OEE (Avail. x Perf. x Qual.)80.7%

OEE = Availability x Performance x Quality. Availability is run time over planned time; performance compares actual output to the ideal cycle time; quality is the share of good units.

Copy linkCopy breakdown

[Track OEE in Odoo →](/schedule)

-   Availability x Performance x QualityThe three standard OEE factors combine into a single, comparable score.
-   Diagnoses a single shiftEnter planned time, downtime, ideal cycle time, and units to see exactly where the losses sit.
-   Result shareable by linkEvery calculation is mirrored in the URL, so you can send or save it without an account.

[Book a Free Consultation](/schedule)[See how Odoo handles it](#odoo)

Embed this calculator on your site

Paste this into your page. The calculator loads in a responsive frame with an attribution link back to Octura.

ThemeDarkLightMax width

−+

px

<iframe src="https://octurasolutions.com/embed/tools/oee-calculator" width="100%" height="780" style="border:0;max-width:560px" loading="lazy" title="OEE Calculator"></iframe> <p style="font-size:13px;color:#555;font-family:system-ui,sans-serif">Powered by <a href="https://octurasolutions.com/tools/oee-calculator">OEE Calculator</a> from <a href="https://octurasolutions.com">Octura Solutions</a></p> <script>window.addEventListener("message",function(e){if(e.data&&e.data.type==="octura-embed"&&e.data.slug==="oee-calculator"){var f=document.querySelector('iframe\[src\*="oee-calculator"\]');if(f){f.style.height=e.data.height+"px"}}});</script>Copy code

## What OEE Is

Overall Equipment Effectiveness (OEE) measures how close a production asset runs to its full potential. It is the product of three factors: Availability x Performance x Quality. An OEE of 100% would mean producing only good parts, as fast as possible, with no stop time.

Availability is run time divided by planned production time, the share of the shift that was actually productive after breakdowns and unplanned stops. Performance compares actual output to what the ideal cycle time would have produced over that same run time. Quality is the share of units that were good first time out of all units produced.

| Factor | Formula |
| --- | --- |
| Availability | Run time / Planned production time |
| Performance | (Ideal cycle time x Total units) / Run time |
| Quality | Good units / Total units |
| **OEE** | **Availability x Performance x Quality** |

Run time equals planned production time minus downtime. Because OEE is a product, a single weak factor pulls the whole score down, which is exactly what makes it a useful diagnostic for where losses live.

## Tracking OEE in Odoo Manufacturing (MRP)

A spreadsheet gives you OEE for one shift; Odoo Manufacturing (MRP) tracks it continuously. Manufacturing orders record produced and scrapped units, work centers capture cycle times and stoppages, and maintenance logs breakdowns. From that live data Odoo computes availability, performance, and quality per work center and per period, with no double entry.

Octura sets up work centers, loss reason codes, and dashboards so OEE becomes a routine measure rather than a quarterly exercise. The goal is to see where the losses go, week over week, and act on them.

[Explore Odoo Manufacturing (MRP) →](/odoo-apps/mrp)

OEE in Odoo?

### We set up OEE tracking in Odoo Manufacturing

[Book a free consultation](/schedule)

#### Related Resources

-   Odoo App2026[Odoo Manufacturing (MRP)](/odoo-apps/mrp)

## How this calculation is made

The Octura OEE Calculator is calculated as Availability × Performance × Quality, where availability is run time ÷ planned production time, performance is (ideal cycle time × total units) ÷ run time, and quality is good units ÷ total units. World-class OEE is around 85 percent.

Backed by real migrations

## Numbers like yours, validated on real migrations

These are three engagements where the projection actually turned into operational reality on Odoo, and the full case studies live on the migration service page.

-   ManufacturingV12 → V17
    
    Industrial Manufacturer, Texas
    
    12custom modules carried over, zero data lost
    
-   DistributionV14 → V18
    
    Wholesale Distributor, Quebec
    
    30%faster page loads once the upgrade shipped
    
-   Professional ServicesCE → Enterprise
    
    Consulting Firm, Brussels
    
    0hproduction downtime during cutover
    

Implementation, migration and audit counts span our senior consultants' careers, including work delivered before Octura was founded in 2024. Go-live weeks and retention are measured on Octura engagements.

Official Odoo Partner · 50+ Migrations Delivered · V8 through V19 [Verify our partner status on odoo.com →](https://www.odoo.com/partners/octura-solutions-21959839?utm_campaign=partner-9354565e&utm_source=partner_ref)

[See the full case studies on migration →](/services/migration#cases)

## Frequently Asked Questions

-   ### How is OEE calculated?
    
    +
    
    OEE is the product of three factors: Availability x Performance x Quality. Availability is run time divided by planned production time; performance is (ideal cycle time x total units) divided by run time; quality is good units divided by total units.
    
-   ### What is a good OEE score?
    
    +
    
    World-class OEE is about 85%. Many plants run closer to 60%, which leaves significant room to improve. An OEE below 60% usually points to meaningful losses in at least one of the three factors.
    
-   ### What do availability, performance, and quality represent?
    
    +
    
    Availability captures stop losses (breakdowns and unplanned stops). Performance captures speed losses (cycles slower than ideal, small stops). Quality captures defect losses (rejected parts and rework).
    
-   ### Does this tool track OEE over time?
    
    +
    
    No. This calculator gives OEE for a single shift from figures you enter. For continuous tracking per work center and period, Odoo Manufacturing (MRP) computes OEE from live production data. Octura sets that tracking up.